New Fram field yields 10 million barrels

Together with its partners, Statoil reports it is recovering approximately 10 million barrels of oil equivalent on the Fram H North structure.

This is made possible through the construction of a seabed template which is connected to the A2 template on Fram West, which transports production on to the Troll C platform. Fram H North is the tenth fast-track project in Statoil's portfolio.

"This project, which is one of the smallest fast-track developments on the Norwegian continental shelf, was made possible by means of standard solutions and fast-track principles to reduce time and costs," says Halfdan Knudsen, project manager for field development in Statoil.

"The development of this field may be a door opener for new developments in the area as the licence partners have approved the installation of a 4-slot standard template to be used for additional targets or for tying back prospects in the event of discoveries. We're excited about our continuing progress and optimistic with regard to what we'll get out of this," adds Knudsen.

Provisional estimates indicate that the field contains recoverable reserves of roughly 10 million barrels of oil equivalent. The installation of all the seabed equipment and laying of pipelines and control cables is planned for the summer of 2013. Drilling, which is due to start in the fourth quarter of 2013, will involve a well with two branches for the optimal draining of the proven reservoir.

Associated companies:


Related news

Latest news

USCG confirms OPtimarin in Line for Ballast Water Approval

The United States Coast Guard (USCG) has confirmed that Norwegian ballast water treatment specialist Optimarin has become the first supplier to submit an application for type approval.

New order for Servogear

Servogear announces that they have received a new order from Brødrene Aa. 

Norwater AS reports boost in sales

The Norwater team reports of great interest and busy days in 2016. In a press release, they state that as of the first 8 months of the year, 2016 sales are already beyond target for the year as a whole.

Gaia-facts reaching ground control

The European Space Agency (ESA) has released the first data from the Gaia mission, which has the tremendous task of building the most precise 3D map of the Milky Way.

Polish delegation for Norwegian circular waste management

Against the background of the EU's ambitious waste management targets, Norwegian and Polish stakeholders met on Wednesday 14 September in Drammen.

Milestone at Mongstad Water Treatment Plant

SAR AS reports that an extensive upgrade to the water treatment plant at Mongstad reached a new milestone July. 

Servogear signs new contract with Özata Shipyard

Servogear has announced the signing of a new contract with Özata Shipyard in Turkey. The contract includes the delivery of Servogear Ecoflow PropulsorTMfor two 39 meter passenger catamarans (YN 41 & YN 42).

Statoil and Petrobras strengthen strategic partnership

Statoil reports that they have strengthened their cooperation in Brazil by signing a Memorandum of Understanding (MoU) with Petrobras.

TechInvent and Island Offshore/Centrica announced winners of ONS Innovation Award

TechInvent and Island Offshore/Centrica were announced winners of the ONS 2016 Innovation Awards, at the Innovation Awards Ceremony Tuesday 30 August.