National Power Transmission Grid, Mozambique

The purpose of the project is to reinforce and extend the Mozambican national power transmission grid specifically in Maputo, Gaza, Inhambane, Zambeze and Nampula Provinces.


The project includes:

  • 275kV Transmission Line Ressano Garcia – Macia (143km); including modifications to Ressano Garcia substation and new 275/110 kV Macia substation with 1x250MVA, 275/110/33 kV transformer.
  • 110kV transmission line Lindela – Massinga (110km), modifications to Lindela substation; new 110/33kV Massinga substation with a 16MVA 110/33kV transformer; 33kV line Massinga-Maxixe (70km).
  • Rural electrification in Homoine and Morumbene districts (46km 33kV line and LV network).
  • Extension of Maputo substation – installation of 1x400MVA, 400/275kV  transformer & associated equipment.
  • Reinforcement of 4 substations [(Chimuara 1x16MVA & 1x40MVA),(Quelimane 1x50/50/20MVA), Alto Molocue 1x100/100/33MVA), (Nampula 1x50 MVA)] in North region of Mozambique.
    • Power Supply to Beloluane Industrial Park (2x120MVA transformers & associated equipment, implemented as extension to Maputo substation).

The project was divided into two phases:

  • Phase 1 - Production of Design Report, Technical Specifications and Tender Documents including ESIA; Contract negotiations and award
  • Phase 2 - Construction Supervision and Project Management.

The project is structured in Packages: Main Package, Optional Package 1, Optional Package 2, and Optional Package 3. This allows for a stage activation of subsequent works which in turn allows a performance audit at various level before the next optional package is activated.

Services Rendered:

  • Line route survey and environmental impact assessment
  • Cost Estimates
  • Conceptual design and technical specifications
  • Tender documents, tender evaluation and contract negotiations
  • Design approval
  • Construction supervision and project management
     

Client: Electricidade de Moçambique (EdM)

Year:
 2011-2019

Associated companies:


Related news

Latest news

BP Awards Schlumberger Contract for Mad Dog 2 Project

Export Conference 2017: A changing world

Register for this year’s most important conference for Norwegian exporters. We can promise you an interesting and inspirational day!

Meet Elkem Silicon Materials at the Ceramics Expo 2017

Elkem Silicon Metrials invites to meet their team at the Ceramics Expo 2017. This is North America’s largest, free-to-attend exhibition for Ceramic manufacturing and applications.

Event - TechnipFMC at Gastech April 4

Most ship owners are now looking very closely at the benefits that digitalization can bring in operational gains.

Deepocean Awarded Surf Contract from BP for the Foinaven Field

DeepOcean today announced that it had received a call-off under its new Master Service Agreement (MSA) with BP Exploration Operating Company Ltd.

Parquet Floor - a Furniture in itself

Read how a Nordic style, maintenance free new floor is a furniture all in itself. 

Haavik in as Sales Director

Tor Henrik Haavik enters the role as Sales Director in Steinsvik AS. Haavik has an engineering education from Høgskolen i Haugesund and has been employed in Steinsvik since 2002. Haavik comes from the position of Sales Man...

Powder Characterization Experts Offer Solutions to Optimize Process Performance

Freeman Technology, the powder characterization specialists, will be exhibiting at the Ceramics Expo for the first time (25 – 27 April, Cleveland, OH, USA). The company offers material characterization solutions aimed at o...